Skip to main content

Vision (critical-path monitoring & SLAs)

BETA Preview

This feature is still being finalized by Development.

In briefVision watches whether the right work finishes on time. A board is a tree of cards: a tag card follows the jobs whose tags match its pattern, in one source environment, for a schedule date, and checks them against SLA targets; a group card rolls up its children. Each card shows one status icon, and its hover panel names the status, from Late and At risk through Finished.

WhereVision, at the top of the navigation, shows the Live board for a Workflow Date. Design › Vision Config is where cards are created, edited and deleted.

When

  • You want to see at a glance whether a critical set of jobs will meet its deadline.
  • You are setting a start or end SLA on a group of jobs that share a tag.
  • A card shows Unknown, No schedule date or Late and you need to know why.

How

  1. On Vision Config, select New Vision Card and create a tag card: Name, Source Environment, Tag(s) and at least one frequency that exists.
  2. Add SLAs to each frequency — SLA Requirement, Time in UTC and Day(s) Offset.
  3. Group related cards under a group card if you want a roll-up.
  4. Watch the cards on Vision, point at a card for its status and job counts, and use Processes to open the jobs behind it. The task walkthrough is Monitor critical paths and SLAs with Vision.
Notes
  • The Vision board refreshes every 15 seconds; there are no push updates.
  • Tag patterns accept * and ? and are case-sensitive.
  • An empty SLA list is valid: the card is monitored only.
Watch out
  • SLA times are compared in UTC, while Start and End on a card show the scheduler's time zone.
  • Triggers are saved with the card, but trigger processing is off by default, so no action fires unless Continuous has turned it on for your organization.
  • A card's source environment cannot be un-bound once set.
  • A frequency a card monitors cannot be deleted until the card stops using it, and a group card cannot be deleted while it has child cards.
  • Vision treats every day as a working day and applies no holidays, so a card can qualify on different days than its workflow runs.